企业邮箱

英文

logo

底部备案

Copyright @ 2019-2020 Guangzhou Baiyun Chemical Industry Co.,ltd. The ICP No.06004805 DESIGN:300.cn

No content information display available
Please add data record on website background.

底部导航

底部左侧

Global Service Hotline:
400-830-1582
Headquarters telephone:
020-37312985
  • 1

Prefabricated building

Page view:

The prefabricated building adopted systematic design, modular split, factory manufacturing and on-site assembly to build the house. Because of the construction techniques are variable. It can effectively avoid the artificial error of the traditional construction method and ensure the building quality. Reducing energy consumption and pollution, can also reduce manpower costs and improve production efficiency.

Because the prefabricated building is assembled with factory prefabricated components. There are inevitably some gaps between components. Sealing of these joints is very important.

The sealant is the first defense line of prefabricated buildings, it directly affects the waterproofing and sealing ability of the prefabricated buildings, So the quality and performance requirements of the sealant is very high.

Where to use: External wall joints(Horizontal gap, vertical gap, cross gap), joints of window with the wall

Key performance: joint movement capability, Weather resistance, adhesion, decorative,modulus.

Related Products

No content information display available
Please add data record on website background.