  • 1

Baiyun silicone structural adhesive quality assurance process

Baiyun silicone structural adhesive quality assurance process

 

Stage name

Contents

Customer needs to provide documents and materials (enter)

Baiyun services

Documents provided to customers (output)

 

Design phase 

1. The curtain wall company provides project information tables, including design drawings (detailed node size and other details) and project design parameters (such as wind pressure, maximum temperature, glass/material size, etc.).

2. Baiyun Chemical Technicians will review the details of the interface on the construction drawing of the project, and issue drawing audit reports based on design parameters such as interface displacement, design air pressure, and sheet size, etc.

3, to help customers choose the right silicone silicone sealant.

1. Project information table

2. Drawings

3. Design parameters

Drawing review

Review report

 
 

Test phase

1. The curtain wall company provides all bonded materials and accessories actually used in the project for adhesion/compatibility testing. The number and specifications of the required samples can be referred to the "Baiyun adhesion/compatibility test application form".

2. The adhesion/compatibility test can be conducted by Baiyun Company or a third-party testing agency and a test report of adhesiveness/compatibility can be issued. The final test results and recommendations will be described in the test report.

3. Material testing must be fully bonded and good compatibility before proceeding with the next step.

1. Baiyun Bonding/Compatibility Test Application Form

2. Test the required materials

Adhesion test

Compatibility test

Adhesion/compatibility test report

 
 

construction stage 

Baiyun provides the following services for curtain wall companies:

1. Approach training: At the beginning of construction, Baiyun technicians will provide technical training for construction personnel. Record the participating trainers and form a training record to ensure that construction workers are qualified for the job.

2. During the construction process, the construction unit shall establish the construction record and quality control test record of the silicone sealant in preparation for inspection.

3. On-site construction guidance (such as weather-resistant plastic, transparent construction of the site construction). Each floor should be tapped for inspection (specific frequency with the curtain wall company).

4. Carry out timely deglazing tests and issue a quality inspection and verification form for the curtain wall unit body of Baiyun's silicone structural sealant (the specific frequency is negotiated with the curtain wall company).

5. During the construction period, our service personnel will count the number of curtain wall units and sealant used at the site and verify the amount of sealant used. It is determined that all the units are using baiyun sealant, and a verification table for the amount of sealant used is issued.

6. On-site watering test, sink test (unit type curtain wall), our service personnel should witness on the spot.

1. Construction record of silicone sealant

2. Quality Control Test Record

1. Construction personnel entering training;

2. Deglazing test;

3. Calculate the amount of sealant.

1. Training record

2. Curtain Wall Unit Body Quality Prosecution Audit Form

3. Use the sealant verification table

 
 
 
 
 

Warranty stage

1. Once all testing has been completed, the curtain wall company will submit all the above documents to Baiyun Company for confirmation;

2. After Baiyun Company reviews the documents, it will provide a project quality guarantee with a 10-year warranty.

 

1. Plan review report

2. Compatibility test report;

3. Adhesion test report;

4. Training record

5. Deglazing report

6. Sealant verification table

 

Document review

Baiyun Quality Guarantee